Projects

Get all the information on the BESS Costa Dorada Project, a Electric Power project. Connect with the contracted companies and their key contacts, track the project stage and milestones, read related news and more. Some issues around this topic are: Energy Storage. Write to us at info@bnamericas.com or call us at +56 (2) 29410300 to schedule a demonstration of our platform.

Description: The project consists of implementing a battery energy storage system (BESS) with 200MW of rated power and 5 hours of autonomy, intended to inject into the National Electric System (SEN) the previously stored energy, in accordance with the operating requirements established by the competent authority. The energy will be evacuated through the Cala Morritos substation, which is under construction. The plant will be composed of 224 modular lithium battery containers, configured in a series and parallel module arrangement, with a storage capacity per container of between 2 and 16MWh. The initiative will be located on 4.48ha in the commune of Ovalle, Coquimbo region, Chile. The construction phase will have an estimated duration of 18 months.

Subscribe to the leading business intelligence platform in Latin America with different tools for Providers, Contractors, Operators, Government, Legal, Financial and Insurance industries.

” class=”btn btn-lg btn__orange-light ” qa-automation=”cmd_robot_btn_footer_content_demo”> Request Demo



Source link

By Steve

Spain is one of my favourite places to visit. The weather, the food, people and way of life make it a great place to visit.